ProjectScope 360
A practical PMO governance framework for IT infrastructure programmes
Define PMO stage gates, steering decisions and evidence checks for IT infrastructure programmes. Connect governance to portfolio reporting in ProjectScope 360.
Why infrastructure needs its own governance rhythm
Infrastructure programmes carry fixed windows: change freezes, contract end dates, hardware lead times and maintenance slots. Governance has to work to those dates rather than a generic monthly cycle.
Set steering meetings ahead of each major window so decisions land before suppliers and engineers need them.
Use evidence-based stage gates
Each gate should ask for named evidence: an approved design, completed test results, a signed-off rollback plan, an accepted operations handover. A gate passes when the evidence exists, not when someone says it is ready.
Keep a short checklist per gate and record who reviewed it and when.
Report what changed, not everything
Sponsors need movement: which milestones slipped, which risks rose, where spend drifted from baseline. A one-page summary with charts drawn from live records beats a long status deck.